How to Build a Post & Beam Shed Foundation on a Slope

How to Build a Post & Beam Shed Foundation on a Slope

by Ethan Hagan (email Ethan) | | May 2, 2012 | 30 Comments »

Last week I had the opportunity to help a friend build the foundation for a new shed that will be delivered in a couple of weeks. His back yard has a bit of a slope, and it would take too much concrete to pour a slab (read how to pour a concrete shed foundation here). For that reason, we decided that building a post and beam foundation would be the best way to go. This article is a step-by-step guide for how we built it, and if you’ve read our article for building a deck, you’ll see some similarities.

Editors update: The shed has been delivered, and I’ve updated this post with some additional pictures. Dave from Maryland’s Best Sheds (who delivered the shed), was very pleased with the foundation, and I’m pumped with how this project came together.

Materials

  • (3) 6 x 6″ pressure treated posts (see below)
  • (1) 4 x 4′
  • (6) 2 x 10″
  • (8) 2 x 8″
  • (3) 80 lbs bags of concrete
  • (3) Pea gravel
  • String line
  • Stakes
  • Spray paint
  • (12) 1/2″ Carriage bolts
  • (12) Washers
  • (12) Nuts
  • (3) Lag screws
  • Galvanized nails
  • Galvanized hanger ties

6 x 6″ Posts: We were able to use each 6 x 6″ for two holes. However, this may not be the case for everyone.

Tip: Pressure-treated lumber is infused with chemical and rated by the amount per cubic foot of wood. Ground-contact lumber has .40 pounds of preservative per cubic foot, and above-ground rated lumber has .25 pounds.

Tip: When purchasing dimensional lumber, pick through the pile to find straight boards.

Tools

  • Shovel
  • Digging bar
  • String level
  • 8′ level
  • Post level
  • Tape measure
  • Large mixing tub
  • Circular saw
  • Reciprocating saw
  • Drill / driver
  • Spade bit
  • Quick clamps
  • Speed square
  • Framing nailer
  • Crescent wrench

Step 1: Plan the Layout

The shed measures 10 x 18′, and we started planning the layout by marking the corners of the shed with stakes. To keep everything square, we measured the diagonal distances to make sure they were equal.

The shed will be constructed on a skid of 4 x 4′s running left-to-right along the length. For that reason, we want our support beams to be perpendicular and run front-to-back. For this project, we decided that 6 posts, (2 rows of 3 posts) would give us a solid foundation.

Step 2: Run String Guides

We ran several string guides set 16″ in from the corners. The string guides were useful for determining the slope of our site, finding the high-point and marking the locations for our post holes. If you look closely, you’ll see the front, far-left corner was our high point, and the back, right corner was the low point. The height difference between these corners is roughly 3′.

When you’re using a string level, make sure the string is very taught. Otherwise, you won’t get an accurate measurement.

Where the strings intersected, they just barely touched so as to not interfere with each other.

Step 3: Mark Hole Locations

From our string guides, we determined the locations for our post holes and marked them with spray paint. The holes measured about 16″ across.

Step 4: Dig Holes

We dug all the holes below the frost line, and here in Maryland that means 30″ deep. We were careful not to dig too deep because we wanted the concrete footers to rest on undisturbed ground.

Tip: Before you start digging, have underground lines (water, gas, power, communication, etc.) located. Call the North America One Call Referral Service (1-888-258-0808). It’s free and required by law.

Step 5: Pour Concrete Footers

Next, we mixed up several bags of concrete and poured 5 – 6″ in each hole.

We let the concrete set for a couple of days.

Step 6: Rough-cut 6×6 Posts

Knowing the approximate height for each post (from our string guides), we rough-cut our 6 x 6″ posts and put them cut-side-up into each hole. The posts are oriented this way because the cut sides will have slightly less pressure-treated chemical in the center.

Step 7: Square and Plumb Posts

We setup a string to mark the front edge of our posts and began leveling each one. A post level is really useful for this step.

As we leveled the posts, we used a small amount of pea gravel and dirt to temporary hold the posts in place. This allowed us to go back and make adjustments if necessary.

In this picture you can see that I placed my pencil between the post and the string (and another pencil on the far post). This is a helpful trick to make sure that each post is the same distance from the string. Otherwise, it’s tougher to check that each post is right in line.

Step 8: Fill and Tamp Holes

When we were satisfied that all the posts were in-line with each other, equidistant and completely level, we began filling in around each post, tamping the dirt as we worked.

Step 9: Mark Support Beam Level

We want to keep the shed as low to the ground as possible while still keeping everything level. Starting at our highest point and using an 8′ level, we marked the bottom of our support beam just a few inches off the ground and then scribed this line across all of the other posts.

Step 10: Cut Posts to Height

Since we’re using 2 x 10″ boards for our support beams, we measured 9-1/4″ (2 x 10″ boards actually measure 1-1/2″ x 9-1/4″) up from our line. Using a quick-clamp and speed square as a straight-edge, we cut each post to the right height. To make this cut, we used a circular saw on each side of the posts and a reciprocating saw to cut through the center.

Step 11: Notch Posts

Each support beam is a double 2 x 10″, and we notched each post where the support beam will sit. We cut our notches to measure 3-1/8″ x 9-1/4″.

Step 12: Build Support Beams

Using a framing nailer, we put rows of 5 nails every 24″ or so on both sides of the support beam. The nails are 3-1/4″ long so driving them at an angle ensures they don’t protrude through the opposite side.

Step 13: Through-bolt Support Beams

After using a string to line up the front of each support beam, we quick-clamped them in place and drilled 5/8″ holes with a spade bit.

Next, we placed our carriage bolts, washers and nuts and used a wrench to tighten everything down.

Step 14: Add Joists

For additional support and to keep our foundation from racking, we added 2 x 8″ joists between the support beams. You can see each joist is secured with hanger ties and sits flush with the top of our support beams.

Step 15: Install Lateral Braces

We also installed lateral braces on the backside posts using a combination of carriage bolts and lag screws.

Step 16: Cut Support Beams to Length

Lastly, we cut the back of the support beams to the appropriate length.

Finished

Here are some pictures of the finished product. I’m really pleased with how everything turned out. The foundation is very solid, completely level, and I’m excited to see the shed delivered. I’ll be sure to add pictures when it arrives.

Here are some additional pictures now that the shed has arrived!

Subscribe and never miss an article!

Free articles delivered conveniently to your inbox
(and no spam, we promise)

  • Enjoy this? Share it!

Related Content Handpicked Content Check Mark Handpicked high quality resources from our site and other sites across the web.
Conversation on This Article

30 Responses to How to Build a Post & Beam Shed Foundation on a Slope

  • jeff_williams responds...
    May 2nd, 2012 8:28 am

    That’s fantastic. How long did it take to do that? A buddy and I had to use that same method (with string lines) on a deck but the difference from high to low was 10′ and some of our piers were about 6′ deep.

    Does your friend have any plans to skirt it with lattice to keep out critters?

    [Reply]

    Ethan Reply:

    Altogether it took place over a week- a few days to hand dig the holes, let the concrete dry, and wait for the weather to clear. The bulk of the work we completed in one full day.
    Yep, he’ll be adding lattice too.

    [Reply]

  • William responds...
    May 2nd, 2012 8:45 am

    I know you guys have done and watched a lot of projects like this, but how much drawing and planning went into this foundation before the first piece of lumber was cut?

    [Reply]

    Ethan Reply:

    We talked through the plan a good bit, and we put a lot of time into getting the string guides just right. From that, we knew where to dig and how (roughly) how tall each post would be. I don’t think we had any drawing at all.

    [Reply]

  • caleb responds...
    May 2nd, 2012 9:22 am

    Looks great! My slope isn’t that big, but will likely end up going this route. That’s!

    [Reply]

  • Tom responds...
    May 2nd, 2012 10:05 am

    I have to say you guys are awesome. I have some many of these articles “favorited” because you keep coming out with how-to’s of things on my to-do list. The deck, the shed, the workbench… all this stuff I am planning on doing, and these articles are a MAJOR help. Thanks for your hard work.

    Question, for anyone who could answer: my shed would be on a slope, too. However, unlike the slope in this article, I’d be putting the shed at the *top* of the incline, at the back of my property. So the question is: where should I put the entrance? It can’t be on the back side (the highest point of the slope) because that’s the back of the property. The front side seems like it’d be steep. The sides would be weird angles. What to do?

    Tom

    [Reply]

    jeff_williams Reply:

    You could do a couple of different things. Side entrance could use a retaining wall either above or below the entrance to create a level spot for an entrance. You could build a side platform and then come at it from above. Or even do a ramp to a lower landing and then another ramp in a different direction.

    [Reply]

    Tom Reply:

    Good thoughts. It sounds like, though, that only the ramp to a lower level option prevents me from somehow approaching the shed from the back. Unless I want to build up land to support a true side entrance, approaching from the side. I see what you are saying with the side platform (I think) but it still forces me to approach from the back — and if I’m going to do that, I might as well make a rear entrance to the shed.

    It might be worth it to move the shed down the slope a little bit to buy some room to approach from the back. I’ll lose some space in my yard — but beggars can’t be choosers. I’m hoping one day to store a ride lawn mower in it.

    Thanks for your thoughts, Jeff.

    Tom

    [Reply]

    Joe Reply:

    also, you could just cut into the hill to level things out. then just put the entrance on the side or back (whichever you want)

  • Derek M. responds...
    May 2nd, 2012 11:34 am

    I know this is the way quick foundations are done, but you didn’t mention that, eventually, the pressure treated wood will rot because it is in contact with the dirt. Yes it’s pressure treated, but that doesn’t mean it won’t rot eventually.
    The foundation should be concrete poured into sonotube so that the concrete is at least 6 inches above ground level. The pressure treated wood should then be anchored to concrete above the ground. A foundation done in this manner will last forever, whereas the foundation described in the article will last for 20 years or so.

    [Reply]

    Ethan Reply:

    Hi Derek,

    All the contractors I’ve talked to say this is a good way to set a foundation. Also, they can point out decks built the same way that are 25+ years old and still in great shape (much like my own deck). Furthermore, local code offers three acceptable ways to construct supports and this is one of them.

    [Reply]

    Fred Reply:

    Derek, one thing to make sure of with this type of foundation is that you’ve purchased ground contact pressure treated wood. With a great deal of moisture, even this type of wood will rot over time; however, with good drainage I think you can expect at least 25-30 years. I would think that in the case of the slope here, you’re probably going to get pretty good drainage around the footers. I personally would be OK with this setup for a shed, but obviously wouldn’t use it for my house.

    [Reply]

  • Simon responds...
    May 2nd, 2012 11:34 am

    Hey Ethan,

    I have a couple of questions:
    1) Did you just place your 6×6 directly onto the concrete? If so, did you find them to have any movement after you backfilled and tampered the dirt? I’d think that once you finished your framing, you’d have no movement so as long as you staid true, you were good, right?
    2) I’m not familiar with (local) building code. Would you need to get your concrete footers inspected or does that not apply for a shed?

    [Reply]

    Ethan Reply:

    Hey Simon,

    1) We put the 6×6′s right on top of the concrete, and they had no movement after we backfilled and tamped the soil. While my friend was shoveling, I was constantly making changes to keep everything level, and good thing because after backfilling, we couldn’t budge the posts at all.

    2) In this area and for this size of a shed, we didn’t need to get anything inspected. If the shed was any bigger, it would have been a different case.

    [Reply]

  • reubencollins responds...
    May 2nd, 2012 3:11 pm

    Cool post. This sounds like a great way to go. I share some of Derek M’s concerns about burying the wood posts, but agree that you’ll probably get many many years out of this before experiencing any problems.

    [Reply]

  • Fred responds...
    May 2nd, 2012 5:55 pm

    Wish I could have been there for this project. This looks great!

    [Reply]

  • Icarus responds...
    May 3rd, 2012 10:52 am

    Good post. I kinda wondered why sometimes people pour a foundation and other times they just go with a Post & Beam instead. I guess slope and amount of effort are the key factors.

    [Reply]

  • eric responds...
    August 14th, 2012 11:11 pm

    how is the shed actually secured to the support beams?

    [Reply]

    Ethan Reply:

    It’s not actually secured to the beams. The shed just sits on top of the foundation. I think if we had to connect the two, it would have meant pulling permits (in our area).

    [Reply]

    jeff_williams Reply:

    You can always attach a few Simpson ties the next time you’re forecast for an Irene-esque storm.

    [Reply]

    Ethan Reply:

    You’re exactly right, and fortunately for us we don’t get very many “high wind” storms that could actually move that shed.

  • Ba bow responds...
    September 24th, 2012 1:59 pm

    Very nice job? Can you tell me where your friend got the shed? I a looking into a shed and live in the MD area, the size you have here is perfect!

    [Reply]

    Ethan Reply:

    Glad you liked it! My friend got the shed through Maryland’s Best Sheds, and the link is at the beginning of the article. I hope to see you around OPC again.

    [Reply]

  • Mehrdad Dastanlee responds...
    October 7th, 2012 11:31 pm

    How to Build a Post for Garage Foundation on a Slope?

    [Reply]

    Ethan Reply:

    Hi Mehrdad,

    I don’t think this sort of foundation would be acceptable for any sort of garage. For that, I believe you’ll need a block and concrete foundation.

    [Reply]

  • Pete responds...
    March 10th, 2013 8:48 pm

    I’m planning to build a foundation and platform for a 10′x8′ resin-steel core shed. However, my slope is steeper than the one in this example. The shed manufacturer says that the platform for the floor needs to be absolutely level and shows a diagram of 2×4′s with 16″ centers. I’m in northern New Jersey. Questions:

    (1) I would like to bring the footings above ground, so the entry side (on higher ground) could be at the proper height for the frame, but the rear, lower side wouldn’t, so I’d need posts there. How would I fasten the frame or posts to the footings?

    (2) Would I be better off using 2×6′s for the frame for more stability? I think the shed diagram is assuming a level base, not one elevated above ground.

    (3) Do you think I’d be better with 6 footings, not 4?

    Thanks, Pete

    [Reply]

    Ethan Reply:

    Hey Pete,

    I would do footings and posts on the high side and low side. Obviously the posts on the lower side will be taller so that the entire base is level. I wouldn’t use 2×4. Go with 2x6s or even 2x8s. For a foundation of that size, I’d suggest 6 footings. Remember, I’m not an expert so these are just my suggestions. Hope this helps.

    [Reply]

    Pete Reply:

    Thanks for the advice; it’s very helpful. Follow-ups:

    1. In the case of an above-ground footing that doesn’t need extension by a post, how is the frame fastened to the footing?

    2. In the case of an above-ground footing that needs a post for more elevation, how is the post fastened to the footing?

    In view of the kind of wind that we’ve had in the past few years, I want to fasten these things, rather than just rest them on the footings.

    Thanks again.

    [Reply]

    Ethan Reply:

    Hey Pete,

    I believe manufacturers (like Simpson) make ties for connecting above-ground footings to posts or directly to PT framing. Unfortunately, I’m not sure what to specifically recommend.

  • MG responds...
    August 1st, 2014 9:04 am

    Hi. Looks great! I have very rocky soil on my sloped property and instead of digging for concrete footings, would digging a 1-2 foot hole filled with tamped aggregate and then placing pre-cast concrete piers that accept 4×4 posts on top of the aggregate work for this project also (assuming it meets code and all that)?

    [Reply]